4-lane Banihal bypass completed, will be fully operational within 15 days: Union Minister

4-lane Banihal bypass completed, will be fully operational within 15 days: Union Minister

images 4

Srinagar, Jan 05 (KNO): Union minister for Road Transport and Highways, Nitin Gadkari Sunday said that 4-lane bypass to Banihal town has been completed and will be fully operational within 15 days. In a post on X (formerly Twitter), the minister, as per news agency—Kashmir News Observer (KNO) said that the 4-lane, 2.35 km bypass to Banihal town, built at a cost of Rs 224.44 crore has been completed.“Strategically located on the Ramban–Banihal section of NH-44, the bypass features 4 viaducts spanning 1,513 meters and 3 culverts, effectively addressing the persistent bottleneck caused by roadside markets and shops,” he said. He added that initially, 2-lane traffic will be released and 4-lane traffic shall be released after junction development within 15 days.“This critical infrastructure ensures unhindered traffic flow, significantly reducing travel time and congestion for both tourists and defense vehicles en route to the Kashmir Valley. Beyond improving regional connectivity, the bypass strengthens national security logistics and enhances tourism prospects in the region,” the minister said—(KNO)

Author
transprint logo
Website |  + posts
Spread the love

Related Posts

12 people injured in bus accident inside Navyouga tunnel, 5 Shifed To GMC Anantnag

Srinagar, March 26:(GNS) At least 12 people were injured when a bus they were travelling in met with an accident inside Banihal Qazigund/Navyouga tunnel on Wednesday evening The bus was…

Spread the love

Iftaar Celebration in Mendhar: A Testament to Unity and Harmony

Mendhar, As the sun set behind the majestic hills of Mendhar ,the town came alive with an atmosphere of warmth and togetherness. The Rashtriya Rifles Battalion, under the aegis of…

Spread the love

Leave a Reply

Your email address will not be published. Required fields are marked *